Fabrication Cyclone 5400 + Duct Outlet Dryer
Steel Structure: 1870 Tons Platework (Silo, Duct, Chute, etc): 480 Tons Machine Installation: 1500 Tons Piping work (Stainless and carbon steel): 20000 DB Moving Floor for Fuel bin: 210 Tons
Design engineering drawing , fabrication and erection for structural steel,Conveyors,Bucket Elevator and operating platform, Plate work farication and erection for equipments: 1350 Tons Thermal oil Piping work : 16500 DB Fabrication for carbon and stainless steel ducting work: 270 Tons Utility Piping System: 52000 DB
Equipment fabrication & Installation: 250 Tons Ducting work / Chimney / Vessel / Multicyclone Conveyor fabrication & Installation: 120 Tons Steel Support for Conveyor: 75 Tons
Duct work: 40 Tons Steel Structural: 145 Tons Combustion Chamber: 32 Tons