Home
clients
projects
All work experiences
domestic Projects
international Projects
services
Fabrication Work
Piping Work
Ducting Work
Machine Installation
Erection Work
Insulation Work
Painting Work
facilities
Safety Policy
certification
download
company profile
Work Experience
contact
All Work Experiences
Location
All
Domestic
International
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
year
All Time
2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
search
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Year
Client
Project
Location
Types of Plant
Purchaser
Work Description
year
Client
Project
location
Types of Plant
Purchaser
Work Description
2024
International
Lycopodium Minerals Canada Ltd
Boto Gold Project
Senegal
Mining
Boto S.A.
5177-3000 Structural Steelwork Fabrication 840.00 Tons
2024
International
Lycopodium Minerals Canada Ltd
Boto Gold Project
Senegal
Mining
Boto S.A.
5177-SEBP-B-MS-3020 Platework Fabrication 422.00 Tons
2024
International
Lycopodium Minerals Pty Ltd.
Kiaka Gold Project
Burkina Faso
Mining
Kiaka SA
2251-4000 Platework Fabrication 506.0
2023
International
Lycopodium Minerals Pty Ltd.
Ahafo North Project
Ghana
Mining
Newmont Ghana Gold Limited
2040-4000 Platework Fabrication 342.58 Tons
301-42
2023
International
Lycopodium Minerals Canada Ltd
Boto Gold Project
Senegal
Mining
Boto S.A.
5177-3090 Welded Tank Platework Supply
301-48
2023
International
Lycopodium Minerals Pty Ltd.
Kiaka Gold Project
Burkina Faso
Mining
Kiaka SA
2251-3000 Structural Steelwork Fabrication 3,340.00 Tons
301-47
2023
International
Terra Nova Technologies Inc.
Morenci Ramp Super Portable Project
USA
Mining
Steel Fabrication 50.87 Ton
224-40
2023
International
Societe Des Mines D'ITY SA
ITY Upgrade Engineering Cost Study
Cote D'Ivoire
Mining
Societe Des Mines D'Ity SA
ROM BIN GIRZZLY 27.86 Ttons
318-20
2023
Domestic
Metro M.D.F. Ltd.
MDF2 Project
Kanchanaburi
MDF Plant
Moving Floor Chip Storage Project 178.73 Tons
149-306
2023
Domestic
Metro M.D.F. Ltd.
MDF2 Project
Kanchanaburi
MDF Plant
Fabrication and Installation of New Suction Duct 33.50 Tons
149-313
2023
Domestic
Metro Industrial Park Co.,Ltd
New Dryer Discharge Cyclone PB#3 (MIP) Project
Prachinburi
Particle Board Plant
Fabrication Cyclone and Duct 120.00 Tons Structural work 260.00 Tons
149-305
2023
Domestic
Moresco (Thailand) Co., Ltd
Expansion Forging Line for Circulation Project
Chonburi
Solvent Extraction Plant
Expansion Forging Line for Circulation Tank 2.5 KL and Production Tank 3 KL.
248-51
2023
Domestic
Moresco (Thailand) Co., Ltd
New Rotary Screw Compressor Project
Chonburi
Solvent Extraction Plant
Rotary Screw Compressor
248-50
2023
International
Lycopodium Minerals Pty Ltd.
Ahafo North Project
Ghana
Mining
Newmont Ghana Gold Limited
2040-3000 Structural Steel Fabrication 2,148.00 Tons
301-41
2022
Domestic
Advance Fiber Co., Ltd
Energy Plant (Mono Cyclone PU.50) Project
Kanchanaburi
MDF Plant
Fabrication and Replace cone part of Mono Cyclone
149-289
2022
International
PT Green Gold Technology
ITY ReCYN Plant Project
Cote D Ivoire
Mining
Fabrication and Supply of Shop Tanks 61.85 Tons
328-01
2022
Domestic
New Pulper Project
New Pulper Project
Singburi
Paper Mill
Equipment Installation, Pipping Supply 273.00 Tons
316-11
2022
International
MT IDA Gold Project
MT IDA Gold Project
Australia
Mining
Platework Package 5 7.50 Tons
288-04
2022
Domestic
Metro Particle Co., Ltd
PB4 - Suratthani Project
Suratthani
Particle Board Plant
Piping work (Supply Mat'l & Installation) 9,640.00 DB
149-282, 149-287
2022
Domestic
S.P.B. Panel Industries Co., Ltd
One Piece Battery SNK Project
Suratthani
Particle Board Plant
Fabrication Mono Cyclone 34.98 Tons
302-08
2022
International
Lane Xang Minerals Limited
One Piece Battery SNK Project
Lao PDR
Mining
CIL Tank Commercial Plae 206.14 Ton
257-19
2022
Domestic
One Piece Battery SNK Project
One Piece Battery SNK Project
Saraburi
Ceramic Plant
Fabrication and Installation work
01-72 to 75
2022
Domestic
Metro Particle Co., Ltd
Particle Board #4
Suratthani
Particle Board Plant
Dry Area Package = 1,023.18 Tons
149-283
2022
Domestic
Metro Particle Co., Ltd
Particle Board #4
Suratthani
Particle Board Plant
Local Fabrication and Installation of Energy Plant = 462.80 Tons
149-278
2022
Domestic
Metro Particle Co., Ltd
Particle Board #4
Suratthani
Particle Board Plant
Fabrication & Installation Energy Plant & Production = 856.80 Tons
149-282
2022
International
Lycopodium Minerals Pty Ltd.
Lafigue Project
Cote d'Ivoire
Mining
2237-4000 Platework Fabrication 1,730 Tons
301-37
2022
Domestic
Metro Particle Co., Ltd
Particle Board #4
Suratthani
Particle Board Plant
Flaking Area and Wet Fuel Bin = 1,365 Tons
149-286
2022
International
Lycopodium Minerals Pty Ltd.
Lafigue Project
Cote d'Ivoire
Mining
2237-3000 Structural Steelwork Fabrication 3,075 Tons
301-38
2022
Domestic
Metro Particle Co., Ltd
Particle Board #4
Suratthani
Particle Board Plant
Fabrication work for Wet Suction and Thermal Oil Piping = 57 Tons Piping work = 12,850 DB Installation work = 10 Tons
149-291
2022
International
Lycopodium Minerals Pty Ltd.
Sabodala-Massawa Sulphide Treatment Project
Senegal
Mining
Tank Platework Fabrication 498.51 Ton
301-33
2022
Domestic
Metro Particle Co., Ltd
PB4 - Suratthani Project
Suratthani
Particle Board Plant
Fabrication and Installatioin of Chute 63.31 Ton
149-297
2022
International
Lycopodium Minerals Canada Ltd
Seguela Project
Cote d'Ivoire
Mining
5148-3000 Strutural Steelwork Fabrication 948.00 Tons
301-30
2022
Domestic
Metro Particle Co., Ltd
PB4 - Suratthani Project
Suratthani
Particle Board Plant
Supply Pipe Material and Support
149-287
2022
International
Lycopodium Minerals Pty Ltd.
Sabodala-Massawa Sulphide Treatment Project
Senegal
Mining
Platework Fabrication 298.00 Tons
301-32
2022
International
Terra Nova Technologies Australia PTY LTD.
Karara Iron Ore Project
Australia
Mining
Tailing Stacker Fabrication 55.65 Tons
224-38
2022
International
Bissa Gold S.A.
Bissa Gold Project
Burkina Faso
Mining
ROM BIN 70.70 Tons
304-06
2022
International
Lycopodium Minerals Canada Ltd
Seguela Project
Cote d'Ivoire
Mining
Platework Fabrication 295.90 Tons
301-31
2022
International
Tietto Minerals Limited
Abujar Gold Project
Cote d'Ivoire
Mining
Platework Fabrication 227.00 Tons
326-01
2022
International
Tietto Minerals Limited
Abujar Gold Project
Cote d'Ivoire
Mining
Structural Steel Fabrication 1,184.00 Ton
326-01
2022
International
Endeavour Mining Societe Des Mines D'Ity SA
ITY CIL Project
Cote D Ivoire
Mining
Fabrication for Chute Feed SAG Mill and Pebble Chute 14.16 Tons
318-18 & 19
2021
International
Lycopodium Minerals Pty Ltd
Bombore Gold Project - Oxide Plant
Burkina Faso
Mining
-
Tank Platework Fabrication: 918.35 Tons
301-27
2021
International
Petowal Mining Company SA
Mako Gold Project
Senegal
Mining
-
Grizzly: 21 Tons
323-01
2021
Domestic
TOA Paint (Thailand) Public Co., Ltd
Storage Tank Farm 2 Project
Samutprakarn
Paint
-
Fabrication and Installation for Storage Tank 70m3
42-106
2021
International
Bissa Gold S.A.
Bissa Gold Project
Burkina Faso
Mining
-
Rom Bin Grizzly: 11 Tons
304-05
2021
International
First Quantum Minerals (Australia) Pty Ltd
Cobre Panama - Ball Mill 6 Project
Panama
Mining
-
Platework Fabrication with Ceramic Lining: 360 Tons
307-06 up to 08
2021
International
Societe Des Mines D'ty SA
ITY CIL Project
Cote D Ivoire
Mining
-
Liner Rom Bin Grizzly: 28 Tons
318-07
2021
Domestic
Golden Crane Prachinburi Co., Ltd
GCRCP Project
Prachinburi
Paper Mill
-
Tank & Tower Erection: 430 Tons , Machine Installation: 1.500 Tons , Piping work: 45,000 DB
83-651, 83-652, 83-653, 83-654, 83-655, 83-656, 83-657
2021
Domestic
Advance Fiber Co., Ltd
Fabrication and Installation Mono Cyclone
Kanchanaburi
MDF Plant
-
Fabrication and Installation Mono Cyclone
149-256, 149-262
2021
Domestic
Siam Paper Laminate Company Limited
New Boiler - Metro HPL Project
Nonthaburi
Paper Laminate
-
Fabrication and Installation work for Conveyor, Termal Oil Piping
149-264
2021
Domestic
Metro M.D.F. Co., Ltd
M.D.F. Line Upgrade Project
Kanchanaburi
MDF Plant
-
Fabrication & Installation , Machine Installation, Piping work:6,000 DB
149-255, 149-257, 149-258, 149-259, 149-260, 149-261, 149-263
2021
International
Renaissance Minerals (Cambodia) Limited
Okvau Gold Project
Cambodia
Mining
-
Piping Spool: 58,778.42 Kg
319-03
2021
International
Perseus Mining Cote D' Ivoire SA
Sissingue Gold Project
Cote D Ivoire
Mining
-
Grizzly Fabrication: 21.67 Tons
321-01
2021
International
Terra Nova Technologies Australia PTY LTD.
Binduli RR Project
Australia
Mining
-
Mobile Tripper Conveyor: 33 Tons
224-37
2021
International
Lycopodium Minerals Pty Ltd
Bombore Gold Project - Oxide Plant
Burkina Faso
Mining
-
Structural Steel Fabrication
301-28
2021
International
Lycopodium Minerals Pty Ltd
Bombore Gold Project - Oxide Plant
Burkina Faso
Mining
-
Platework Fabrication
301-29
2021
International
Sabodala Gold Operations SA
Sabodala Gold Operations Project
Senegal
Mining
-
Platework and Steelwork 132.50 Tons
325-01
2021
Domestic
Pathum Vegetable Oil Co., Ltd
Process Bio Diesel #5 Project
Pathumthani
Vegetable Oil
-
Fabrication Tank 10.85 Tons
264-12
2021
Domestic
Pathum Vegetable Oil Co., Ltd
Process Bio Diesel #5 Project
Pathumthani
Vegetable Oil
-
Fabrication work (Structure) : 720 Tons , Installation work (Equipment) : 400 Tons
264-13
2021
Domestic
Empower Steel Co., Ltd
Colour Coating Line Project
Samutprakarn
Colour Coating Line
-
Mechanical, HV incoming, Electrical and Instrument : 2,000 Tons
324-01
2021
Domestic
Metro Particle Co., Ltd
PB4 - Suratthani Project
Suratthani
Particle Board Plant
-
Steel work in foundation (Production Hall) : 47.39 Tons
149-269
2021
Domestic
Moresco (Thailand) Co., Ltd
Expansion Project
Chonburi
Solvent Extraction Plant
-
Mixing Tank 4 KL, Hot Water Tank and SCADA with Instrument : 3 Tons
248-29
2020
Domestic
TOA Performance Coating Corporation Co., Ltd.
Abrasive Plant Project
Chonburi
Paint Manufacturing Plant
-
Fabrication work: 90 Tons, Installation work: 280 Tons, Painting work: 3640 Sq.m
42-104
2020
International
Emerald Resources NL
Okvau Gold Project
Cambodia
Mining
-
Structural Steel Fabrication 562 Tons, Platework Fabrication 148 Tons
319-02, 319-01
2020
International
Teranga Gold Corporation
Wahgnion Gold Operations Project
Burkina Faso, West Africa
Mining
-
Piping work: 262 DB Chute, Primary Crusher Feed Chute: 2.66 Tons Rubber Wear Palte Rom Bin Grizzly: 10.8 Tons
310-10, 310-06, 310-05, 310-04
2020
International
First Quantum Mineral (Australia) Pty Ltd
Cobre Panama Project
Australia
Mining
-
Structure steel and Platework Fabrication: 97 Tons Platework Fabrication: 16 Tons
307-04, 307-05
2020
Domestic
Total Engineering (Thailand) Co., Ltd
Total Engineering (Thailand) Co., Ltd
Ubonratchathani
Trading Company
-
Fabrication of Carbon Steel Pipe Spool
308-19, 308-20, 208-21, 308-22, 308-23, 308-24, 308-25, 308-26, 308-27, 308-28, 308-29
2020
International
Societe des Mines d'Ity
ITY CIL Project
Cote d Ivoire
Mining
-
Tramp Magnet Steelworks Fabrication: 6.85 Tons
318-02
2020
Domestic
National Power Supply Public Co., Ltd
National Power Supply Public Co., Ltd
Prachinburi
Power Plant
-
Installation work for Coal Sampling System
83-642
2020
International
Lycopodium Minerals Canada Ltd
Sabodala Modifications Project
Senegal
-
Teranga Gold Corporation
5145-3000 Structural Steel Supply Fabrication: 224 Tons
301-24
2020
International
Lycopodium Minerals Canada Ltd
Sabodala Modifications Project
Senegal
-
Teranga Gold Corporation
5145-4000 Platework Fabrication: 140 Tons
301-25
2020
Domestic
Metro M.D.F. Co., Ltd
M.D.F. Line 2 Upgrade Project
Kanchanaburi
MDF Plant
-
Erection and Fabrication: 319.85 Tons
149-250
2020
International
SOCIETE DES MINES D’ITY SA
ITY CIL Project
COTE D IVOIRE
-
-
Ball Mill Charger Kibble 132-ZM-029: 933.14 Kg.
318-04
2020
International
SOCIETE DES MINES D’ITY SA
ITY CIL Project
COTE D IVOIRE
-
-
Chute Feed Primary Crusher 121-CH-006: 6,104.62 Kg.
318-05
2019
Domestic
China Light Industry International Engineering Co., Ltd
Double A - RCP Project
Prachinburi
Engineering & Construction
-
Mechanical Erection and Piping work: 40000 DB
315-01
2019
Domestic
C.A.S. Paper Mill Co., Ltd
CASTM1 Project
Singburi
Paper Mill
-
Mechanical Erection for CASTM1 Project: 25000 DB
316-01
2019
Domestic
Toscotec S.P.A.
CASTM1 Project
Singburi
Paper & Pulp Mill
-
Mechanical Erection for CASTM1 Project
317-01
2019
International
Societe des Mines d'Ity
ITY CIL Project
Cote d Ivoire
Mining
-
Rubber Wear Plates Supply
318-01
2019
International
Lycopodium Minerals Pty Ltd
Yaoure Gold Project
Cote d Ivoire
Mining
-
Structural Steelwork Fabrication: 1788 Tons
301-20
2019
International
Lycopodium Minerals Pty Ltd
Yaoure Gold Project
Cote d Ivoire
Mining
-
Platework Fabrication: 1100 Tons
301-21
2019
International
Terra Nova Technologies, Inc.
Nevada Coppoer - Pumpkin Hollow Project
United States
Mining
-
Conveyor Fabrication: 32 Tons
224-34
2019
International
Terra Nova Technologies, Inc.
Aurora Project
Guyana
Mining
-
Conveyor Fabrication: 172 Tons
224-33
2019
Domestic
Moresco (Thailand) Co., Ltd
Moresco (Thailand) Co., Ltd
Chonburi
Solvent Extraction Plant
-
Modification Civil Area Tank and Renovated Pump Modification Piping and Electrical Scada Loadcell
248-45, 248-46
2019
Domestic
Siam Sanitary Ware Industry (Nongkhae) Co.,Ltd
Glazing Robot Project
Saraburi
Ceramic Plant
-
Foundation and Ceiling work
01-69
2019
Domestic
Metso Thailand Co., Ltd
Charnyut Project
Loei
-
-
Platework Fabrication: 130 Tons
313-01
2019
Domestic
Global Green Chemicals Public Co., Ltd.
Clycerine II Project
Choburi
Chemical Plant
-
Mechanical & Installation: 120 Tons Piping Work: 20000 DB
312 01
2019
Domestic
Total Engineering (Thailand) Co., Ltd
Total Engineering (Thailand) Co., Ltd
Ubonratchathani
Trading Company
-
Fabrication of Carbon Steel Pipe Spool
308-09, 308-10, 308-11, 308-12, 308-13, 308-14, 308-15, 308-16, 308-17, 308-18
2019
International
Bissa Gold S.A.
Bissa Gold Project
Burkina Faso, West Africa
Mining
-
Bar; Type Rom Bin Grizzly, Industry Stand Small
304-04
2019
International
Lycopodium Minerals Pty Ltd
Sanbrado Gold Project
Burkina Faso, West Africa
Mining
Societe des Mines de Sanbrado SA (SOMISA SA)
Platework Fabrication: 464 Tons
301-19
2019
Domestic
TOTO (Thailand) Co., Ltd
TTL Plant 1 & 2 Project
Saraburi
Ceramic Plant
-
Machine fabrication & Piping work
273-81, 273-82, 273-83, 273-84, 273-85, 273-86, 273-87, 273-88, 273-89, 273-90, 273-91, 273-92, 273-94, 273-95, 273-96, 273-97
2019
Domestic
Metro Particle Co., Ltd
PB1 , PB2 and PB3 Project
Nonthaburi, Prachinburi, Karnchanaburi
Particle Board Plant
-
Fabrication and Installation work
149-210, 149-211, 149-222, 149-223, 149-224, 149-225, 149-226, 149-227, 149-228, 149-229, 149-230, 149-231
2019
Domestic
Green Fiber Co., Ltd
Green Fiber Co., Ltd
Chachoengsao
-
-
งานยกหลังคาอาคาร Hot Press line 1 บริเวณกริต Line A-E, 27-30 งานโครงสร้างเหล็กรองรับ Overhead Crane 30 Tons
83-639
2018
International
Lycopodium Minerals Canada Ltd
GINMIN Bonasika Project
Ghana
Mining
Guyana Industrial Minerals Inc.
Platework Fabrication: 122.67 Tons
301-17
2018
International
Lycopodium Minerals Pty Ltd
Wahgnion Gold Project
Burkin Faso, West Africa
Mining
-
Platework Fabrication: 475 Tons
301-13
2018
International
Lycopodium Minerals Pty Ltd
ITY CIL Project
Cote D Ivoire
Mining
-
Platework Fabrication: 850 Tons
301-10
2018
Domestic
Total Engineering (Thailand) Co., Ltd
Total Engineering (Thailand) Co., Ltd
Ubonratchathani
Trading Company
-
Fabrication of Carbon Steel Pipe Spool
308-01, 308-02, 308-03, 308-04, 308-05, 308-06, 308-07, 308-08
2018
Domestic
Thai Steel Profile Public Co.,Ltd.
Thai Steel Profile Public Co.,Ltd.
Rayong
Steel Plant
-
Dismantle & Installation for Piping
300-19
2018
Domestic
TOA Paint (Thailand) Public Co., Ltd
TOA Tank T-2112 Project
Samutprakan
Paint Manufacturing Plant
Eastman Chemical Limited
Storage Tank 30 M3 and Piping
42-99
2018
Domestic
Ajinomoto (Thailand) Co., Ltd.
Modification work Project
Ayutthaya
Food Plant
Easterngroup E.T.G
Fabrication , Demolish and Installation work
08-52, 08-53
2018
International
First Quantum Mineral (Australia) Pty Ltd
Cobre Panama Project
Australia
Mining
-
Tailings Dam Platework: 257.64 Tons Platework Fabrication: 60 Tons Coarse Cleaner Feed Hoppers: 9.8 Tons
307-01, 307-02, 307-03
2018
International
Teranga Gold Corporation
Wahgnion Gold Project
Burkina Faso, West Africa
Mining
-
Fabrication work
310-01
Next