Home
clients
projects
All work experiences
domestic Projects
international Projects
services
Fabrication Work
Piping Work
Ducting Work
Machine Installation
Erection Work
Insulation Work
Painting Work
facilities
Safety Policy
certification
download
company profile
Work Experience
contact
All Work Experiences
Location
All
Domestic
International
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
year
All Time
2022
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
search
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Year
Client
Project
Location
Types of Plant
Purchaser
Work Description
year
Client
Project
location
Types of Plant
Purchaser
Work Description
2009
Domestic
Advance Agro Public Co.,Ltd.
Fabrication & Supply Tank Nozzle
Prachinbuir
Ethanol Plant
-
Fabrication work: 26 Tons Supply for Tank Nozzle
83-525
2009
International
Ausenco Services Pty Ltd.
Snapper Minerals Sands Project - 1855-0439 Structural Steel - Float Concentrator
Australia
Mining
-
All Structural Steel Fabrication work as light / Medium & Heavy, Handrailing, Galv grating: 900 Tons Work Detail : - Structural Steel = 650 Tons - Grating / Stair = 5,000 M2 - Handrailing = 2,100 M - Roofing / Cladding = 2,600 M2 - Purlin / Girt = 3,000 M
247-32
2009
Domestic
ISPS International Steel Plant Services AG
ISPS International Steel Plant Services AG
Rayong
Steel Plant
-
Fabrication work: 960 Tons
254-02
2009
Domestic
Pathum Vegetable Oil Co.,Ltd.
Plant Extension
Pathumthani
Vegetable Oil
-
Steel Structure : 390 Tons Equipment Installation: 120 Tons
264-01
2009
International
Lane Xang Minerals Limited
Supply of Structural : Package 3
LAOS PDR
Mining
-
Fabrication work: 900 Tons
257-04
2009
International
Terra Nova Technologies, Inc.
DIV 003 Mobile Tripper Project
USA
-
Mobile Tripper Conveyor 2 Sets
224-09
2008
Domestic
TOA Paint (Thailand) Public Co., Ltd
New Water Based Paint Production
Samutprakarn
Paint Manufacturing Plant
-
Piping work: 61536 DB Equipment Installation: 50 Tons Design, drawing, fabrication and erection for structural steel: 200 Tons
42-28
2008
International
Lane Xang Minerals Limited
Sepon Copper Expansion Project : Package 3
LAOS PDR
Mining
Khanong Development Group
Steel structure fabrication: 700 Tons
257-01
2008
International
Lane Xang Minerals Limited
Sepon Copper Expansion Project : Package 2
LAOS PDR
Mining
Khanong Development Group
Steel structure fabrication: 200 Tons
257-02
2008
Domestic
ISPS International Steel Plant Services AG
Concast AG - Siam Yamato Project
Rayong
Steel Plant
-
Steel structure fabrication: 1000 Tons
254-01
2008
Domestic
Double A Ethanol Co., Ltd.
Tank & Storage Tank
Prachinburi
Ethanol Plant
-
Plate work: 428 Tons
83-519, 83-521
2008
Domestic
Danieli Far East Co.,Ltd.
Bag Filter
Steel Plant
-
Plate work of structure: 170 Tons
252-01
2008
International
Terra Nova Technologies, Inc.
Copler Project
USA
-
-
Horizontal Conveyor, Overland Conveyor, and Radial Stacker
224-06
2007
Domestic
Agro Fiber Co., Ltd.
Cyclone Dismantle / Installation New on / 2 Units
Prachinburi
MDF Plant
-
Fabrication & Erection: 25 Tons
86-65
2007
Domestic
Sima Inter Product Co.,Ltd.
Fermentor & Beer well
Chachoengsao
Ethanol Plant
-
Fabrication & Erection: 275 Tons
162-04
2007
Domestic
Siam Rajathanee Public Co., Ltd.
PTT Public Co.,Ltd. South Bangkok Metering and Requlating Station
Samutprakarn
Refinery
Siam Rajathanee Public Co., Ltd.
Piping work and Equipment Installation: 1
184-14
2007
Domestic
Thai Paper Co.,Ltd. (Weston Myer Ltd.)
Mechanical work of for KK-1 Project
Khonkaen
Paper Mill
Andritz Technoloies Ltd.
Piping work: 25000 DB Equipment Install: 350 Tons Platform: 30 Tons
150-08
2007
Domestic
Wellman Co.,Ltd.
ES Power Ethanol Project
Srakaew
Ethanol Plant
Storage tank fabrication & Erection: 200 Tons
246-01
2007
Domestic
TOA Paint (Thailand) Public Co., Ltd
Storage , chemical,mixing and process Tank (SUS304 and Carbon steel) 108 sets
Samutprakarn
Paint Manufacturing Plant
-
Fabrication & Installaiton: 180 Tons
42-23
2007
Domestic
Thai Paper Co.,Ltd. (Weston Myer Ltd.)
Tank Supply for KK1 Project
Khonkaen
Paper Mill
GAW German
Stainless Tank Fabrication: 30 Tons
150-07
2007
International
Terra Nova Technologies, Inc.
Somair New Project
United States
Mining
-
Conveyor Frame Fabrication: 200 Tons
224-05
2007
International
Ausenco International Pty Ltd
Phukham Project
LAOS PDR
Mining
-
Conveyor frame fabrication: 1000 Tons Plate work / Chute / Hopper: 120 Tons
247-01, 247-09
2007
Domestic
Organo (Thailand) Co.,Ltd.
DAF 5500 Fabrication
Waste Water Treatment Plant
-
Clarifier fabrication: 36 Tons
249-02
2007
Domestic
Acculine Engineering Limited.
Pre-treatment booth
-
-
Fabrication & Erection: 30 Meters
251-01
2007
Domestic
Danieli Far East Co.,Ltd.
Bag Filter Project
Rayong
Steel Plant
-
Fabrication: 160 Tons
252-01
2006
Domestic
Advance Biopower Co.,Ltd. Burirum
Boiler Erection
Burirum
Power Plant
Veesons Energy System Pvs.Ltd.
Piping & Installation (10 MW): 615.61 Tons
236-01
2006
Domestic
First Global International Co.,Ltd.
Regitex Project Regitex Co.,Ltd.
Rayong
Chemical Plant
First Global International Co.,ltd
Equipment Installation and Piping work: 1
90-57
2006
Domestic
Thai Paper Co.,Ltd. (Weston Myer Ltd.)
KK1 Project
Khonkaen
Paper Mill
Andritz Technoloies Ltd.
Storage Tank / Tower Tank / Fabrication & Erection: 210 Tons
150-03
2006
Domestic
Good Year (Thailand) Public Co.,Ltd.
Machine Installation
Pathum Thani
Tyre Plant
-
Equipment Installaiton: 350 Tons
234-04
2006
Domestic
Andritz Technoloies Ltd.
Waste Plant Project
Kanchanaburi
Pulp Mill
Piping work: 20000 DB Equipment Installation: 200 Tons Tank Erection: 30 Tons
237-03
2006
Domestic
TSK Engineering (Thailand) Co.,Ltd.
Storage Tank
Saraburi
Ethanol Plant
-
Fabrication & Erection: 105 Tons
244-01
2006
Domestic
Advance Fiber Co., Ltd
Dryer Duct SUS304
Kanchanaburi
MDF Plant
-
Fabrication & Installation: 140 Tons
149-45
2006
Domestic
Advance Fiber Co., Ltd
Cooling wheel & Welding Jig
Kanchanaburi
MDF Plant
-
Fabrication & Installation: 62 Tons
149-47
2006
Domestic
Advance Fiber Co., Ltd
Fuel bin & Submerge Conveyor
Kanchanaburi
MDF Plant
-
Fabrication & Installation: 80 Tons
149-46
2006
International
Terra Nova Technologies, Inc.
Heap Leach Conveyor Frame for Lady Annie Project
United States
Mining
-
Conveyor frame Fabrication: 200 Tons
224-03
2006
Domestic
Ajinomoto (Thailand) Co., Ltd.
Chimney & Duct work
Food Plant
-
Fabrication & Installation: 40 Tons
08-45
2006
International
Andritz Fiber Drying AB
Cyclone and Storage Tank : SUS304
Sweden
MDF Plant
-
Cyclone Fabrication: 30 Tons Tank work: 60 Tons
237-02
2006
Domestic
Hexon Engineering Co.,Ltd.
Tank Fabrication for TUPI #9
Kanchanburi
Paper Mill
Storage Tank: 0 Tons
243-01
2006
Domestic
Mitrphol Sugar Factory
Dryer Project
Khonkaen
Sugar Plant
-
Dryer Fabrication: 45 Tons
245-01
2005
Domestic
Thai Union Paper Public Co.,Ltd.
Yankee dryer PM.2 and Installation work (Crane Operation)
Samutprakarn
Paper Mill
-
Installation work (Dismantle & New Replace): 1
18-18
2005
Domestic
Siam Quality Starch Co.,Ltd.
Piping System
Chaiyapoom
Food Plant
-
Piping work (SUS304): 18000 DB Valve: 1560 In-Pcs
-
2005
Domestic
Advance Agro Public Co.,Ltd.
Dissolving Tank Vent Gases Scrubbling System for Pulp Mill 1
Prachinburi
Paper & Pulp Mill
-
Fabrication work: 24 Tons Piping work: 4000 DB
83-488
2005
Domestic
Advance Agro Public Co.,Ltd.
200 M3 Pressure Vessel SUS 304L
Prachinburi
Paper & Pulp Mill
-
Tank Erection: 45.8 Tons
83-492
2005
Domestic
Nakornthai Strip Mill Public Co.,Ltd.
Piping work
Chonburi
Steel Plant
-
Piping work: Minor DB
121-22
2005
Domestic
Nakornthai Strip Mill Public Co.,Ltd.
ARP and PPPL for Equipment Installation work
Chonburi
Steel Plant
-
Installation work: 822.95 Tons
121-05
2005
Domestic
CH. Karnchang Public Co.,Ltd.
Suwannaphume Airport ( BAFS) JP-One and Into plane
Samutprakarn
Aviation Fuel
CH. Karnchang Public Co.,Ltd.
Piping work: 24264 DB
177-35
2005
Domestic
Good Year (Thailand) Public Co.,Ltd.
Equipment Installation
Pathum Thani
Tyre Plant
-
Machine Installation: 662 Tons
234-01
2005
Domestic
Ferro (Thailand) Co.,Ltd.
Tunnel work for Scrubber System of SM#1 - 10
Saraburi
Ceramic Plant
-
Fabrication and Installation: 64 Tons
21-201
2005
Domestic
Vanachai Panel Industries Co.,Ltd.
Equipment Fabrication
Plywood Plant
Vyncke Thailand
Fabrication work: 46 Tons
-
2005
Domestic
Ferro (Thailand) Co.,Ltd.
Stack and Ducting work of SM# 1- 8
Saraburi
Ceramic Plant
-
Fabrication and Installation: 73 Tons
21-202
2005
Domestic
Vanachai Panel Industries Co.,Ltd.
Stainless Steel Tank (17 Units)
Plywood Plant
Vyncke Thailand
Fabrication work: 25.74 Tons
-
2005
Domestic
York Refrigeration (Thailand) Co.,Ltd.
Belt Conveyor
Rayong
-
Takuma Co.,Ltd.
Fabrication work: 16.4 Tons
178-07
2005
Domestic
York Refrigeration (Thailand) Co.,Ltd.
PAC 355-L MK 15
Rayong
-
Takuma Co.,Ltd.
Fabrication work: 8.94 Tons
178-07
2005
Domestic
York Refrigeration (Thailand) Co.,Ltd.
Cat Walk & Platform & Grating
Rayong
-
Takuma Co.,Ltd.
Fabrication work: 14.63 Tons
178-07
2005
Domestic
Karntner Maschinefabriken
Hood Support Structure
Prachinburi
-
-
Fabrication work: 31.29 Tons
229-01
2005
Domestic
Diamond Starch Co., Ltd.
Reaction Tank 60 M3
Nakornrachasrima
Starch Plant
-
Fabrication work: 35.2 Tons
228-01
2004
Domestic
Advance Agro Public Co.,Ltd.
Equipment Installation for ESP 2 Unit
Prachinburi
Paper & Pulp Mill
BHEL India
Equipment Installation - Recovery Boiler Unit: 810 Tons
-
2004
Domestic
Advance Agro Public Co.,Ltd.
Dissolving Tank Vent Gases Scrubbling System for Pulp Mill 2
Prachinburi
Paper & Pulp Mill
-
Fabrication work: 24 Tons Piping work: 4000 DB Insulation work: 500 Sqm.
-
2004
Domestic
Advance Agro Public Co.,Ltd.
Evaporator 1 Upgrade
Prachinburi
Paper & Pulp Mill
-
Piping work: 8200 DB Equipment Installation: 25 Tons Relocate Equipment: 30 Tons Insulation work: 2000 Sqm. Platform: 6000 Tons
-
2004
Domestic
Advance Agro Public Co.,Ltd.
Cooling Water Piping Pulp 2
Prachinburi
Paper & Pulp Mill
-
Piping work: - DB
-
2004
Domestic
Thai Union Paper Public Co.,Ltd.
Stock prepartion PM #5 Modification
Samuprakarn
Paper Mill
-
Machine Installation: 50 Tons Existing M/C Relocate
18-16
2004
Domestic
Inter Pacific Paper Co.,Ltd.
Equipment Installation
Prachinburi
Paper Mill
-
Machine Installation: 1600 Tons Fabrication and installation works: 2000 Tons
213-01
2004
Domestic
CH. Karnchang Public Co.,Ltd.
SBIA Aviation Fuel Depot Project Suwanaphum Airport - Bangkok Aviation Fuel Services Public Co.,Ltd
Samutprakarn
Aviation Fuel
CH. Karnchang Public Co.,Ltd.
Piping work for fuel & Water line Carbon steel pipe: 47200 DB SUS304 pipe: 3100 DB Equipment Installation: 30 Tons
177-26
2004
Domestic
Sibelco Minerals (Thailand) Co.,Ltd.
Ball Mill #3 Plant Extension
Nakornpathom
Mineral Plant
-
Silo Equipment Fabrication: 90 Tons Structure & Platform: 75 Tons Conveyor: 12 Sets Equipment installation Machine: 200 Tons Silo , Str. / P / F: 165 Tons
218-01, 218-02
2004
Domestic
Rhodia Thai Industries Ltd.
Acrylic resin plant expansion project
Samutsakorn
Chemical Plant
Technip
Piping work: 10000 DB Fab. & Erection work: 39.2 Tons Carbon steel Tank : 34.9 Tons SUS 304 Tank : 4.3 Tons
153-10
2004
Domestic
Rhodia Thai Industries Ltd.
Starch Granulation Phase #2
Samutsakorn
Chemical Plant
-
Piping work: 0 DB Fabrication & Erection: 150 Tons
153-09
2004
Domestic
Rhodia Thai Industries Ltd.
Fire fighting piping work
Samutsakorn
Chemical Plant
-
Piping work
153-11
2004
Domestic
Gulf Yala Green Co.,Ltd.
Yala Green Power Project
Yala
Power Plant
Takuma Co.,Ltd.
Steel structure fabrication: 423 Tons Conveyor: 152 Tons Vessel / Chute: 15 Tons
222-01
2004
Domestic
Environment Pulp and Paper Co.,Ltd.
Chlorine Dioxide Plant
Nakornsawan
Chemical Plant
-
Equipment Installation: 180 Tons Piping work: 0
212-01
2004
International
Terra Nova Technologies, Inc.
Phu Bia Mining Limited. Steel Fabrication of Conveyor
LAOS PDR
Mining
Structure & Casing Fabrication: 35 Tons
224-01
2004
Domestic
Ferro (Thailand) Co.,Ltd.
Smelter Extention
Sarabuir
Ceramic Plant
-
Smelter Frame #8 , Recuperator Smelter, Quencher basket , Ribbon blender, Screw Feeder , Smelter Feeder, Chimney, Duct work, Structure & Platform : 150 Tons
21-158
2004
Domestic
Siam Quality Starch Co.,Ltd.
Slurry Tank & Silo
Chaiyaphoom
Starch Plant
-
Fabrication & Installation: 90 Tons
50-108
2004
Domestic
Siam Quality Starch Co.,Ltd.
Roller Washer
Chaiyaphoom
Starch Plant
-
Fabrication work: 84 Tons
50-105
2004
Domestic
Siam Quality Starch Co.,Ltd.
Soaking Drum
Chaiyaphoom
Starch Plant
-
Fabrication work: 61 Tons
50-105
2004
Domestic
Siam Quality Starch Co.,Ltd.
Storage Tank
Chaiyaphoom
Starch Plant
-
Fabrication work: 10 Tons
50-105
2004
Domestic
Siam Quality Starch Co.,Ltd.
Equipment & Structure
Chaiyaphoom
Starch Plant
-
Fabrication & Erection: 380 Tons
50-105
2004
Domestic
First Global International Co.,Ltd.
Segment Mold Fabrication work
Mokdaharn
Form work
-
Fabrication work: 252 Tons
90-46
2004
Domestic
Access Industrial Technology Co.,Ltd.
Silo 170 M3 Dia.3.6m x 20.928 ml
Nakornpathom
Starch Plant
-
Fabrication & Erection: 16 Tons
176-08
2004
Domestic
First Global International Co.,Ltd.
Full round forms Dia 3 M
Mokdaharn
Form work
-
Fabrication work: 68 Tons
90-44
2004
Domestic
Thai Industrial & Engineering Service Co.,Ltd
Nippon Tank for New Resin Plant
Chachengsoa
Chemical Plant
-
Fabrication work: 45 Tons
214-01
2003
Domestic
Advance Agro Public Co.,Ltd.
Cutsize sheeter installation
Prachinburi
Paper & Pulp Mill
-
Machine installation: 168 Tons
83-
2003
Domestic
Industrial Power Technology (Thailand) Co., Ltd.
Bua Sommai 6 MW Rice Husk Fueled Power plant , Roi-et
Roi-et
Power Plant
Mechanical Erection: 510 Tons Boiler welding work: 0 DB Fabrication of Chimney Ducting, Platform & Ladder: 72 Tons
206-01
2003
Domestic
Siam Rajathanee Public Co., Ltd.
EGAT (Wangnoi) Wangnoi Combined Cycle Power Plant
Auythaya
Power Plant
Siam Rajathanee Public Co., Ltd.
Piping Gas Compressor: 46 Tons Civil / Electrical Work / Modify / Insulation: 0
184-04
2003
Domestic
Siam Sanitary Ware Industry Co.,Ltd.
Casting Machine Fabrication
Ceramic Plant
-
Fabrication work: 30 Tons
01-52
2003
Domestic
Ferro (Thailand) Co.,Ltd.
Smelter #7 Extention
Saraburi
Ceramic Plant
-
Recuperator Smelter: 12 Tons Smelter frame #7: 3 Sets
21-113
2003
Domestic
First Global International Co.,Ltd.
Storage Tank Ajinomoto (Thailand) Co., Ltd.
Kamphaengphet
Food Plant
First Global International Co.,ltd
Fabrication work: 40 Tons
90-36
2003
Domestic
Metro Particle Co., Ltd
Dryer plant
Kanchanaburi
Particle Board Plant
-
Duct work: 40 Tons Steel Structural: 145 Tons Combustion Chamber: 32 Tons
149-29
2003
Domestic
Metro Particle Co., Ltd
Energy plant
Kanchanaburi
Particle Board Plant
-
Equipment fabrication & Installation: 250 Tons Ducting work / Chimney / Vessel / Multicyclone Conveyor fabrication & Installation: 120 Tons Steel Support for Conveyor: 75 Tons
149-31
2003
Domestic
Metro Particle Co., Ltd
Wind shifter
Kanchanaburi
Particle Board Plant
-
Duct work: 20 Tons
149-30
2003
International
Astuce Technologies & Marketing Pte Ltd.
Belt Conveyor Feed Manifold & Column
Paper Mill
-
Fabrication & Installation: 26 Tons
194-02
2003
Domestic
Pan Asia Paper (Thailand) Co.,Ltd.
Storage tank
Singburi
Paper Mill
-
Fabrication work: 25 Tons
173-04
2003
Domestic
Asia Kraft Paper Co., Ltd.
Hydrapulper
Singburi
Paper Mill
-
Fabrication & Erection: 12 Tons
181-01
2003
Domestic
Executive Intertrade Co.,Ltd.
Fuel Gas Channel
Saraburi
-
-
Fabrication work: 16 Tons
208-02
2003
Domestic
Executive Intertrade Co.,Ltd.
Klin car 135 Sets
Saraburi
-
-
Fabrication work: 110 Tons
208-01
2002
Domestic
Advance Agro Public Co.,Ltd.
HP Steam Line Erection
Prachinburi
Paper & Pulp Mill
-
Piping Work: 2882 DB Sch 100 A335 P11 , 13 CrMo44 , AISI 316
83-271
2002
Domestic
Advance Agro Public Co.,Ltd.
Pulp Drying Machine roof structure work
Prachinburi
Paper & Pulp Mill
-
Steel Structure erection: 40 Tons
83-303
2002
Domestic
Advance Agro Public Co.,Ltd.
False ceiling extension for MP1
Prachinburi
Paper & Pulp Mill
-
Modify work: -
83-311
2002
Domestic
Siam Rajathanee Public Co., Ltd.
EGAT (Lankrabue) Inter Connecting Pipe,Lankrabue Project
Kamphaengphet
Power Plant
Siam Rajathanee Public Co., Ltd.
Pipe C/S API - 5L Gr.B , SUS304 Sch40 , Radiographic test (Random): 1
184-02
2002
Domestic
Siam Sanitary Ware Industry Co.,Ltd.
Casting Machine
Saraburi
Ceramic Plant
-
Fabrication work: 105 Tons
01-38
2002
Domestic
Ferro (Thailand) Co.,Ltd.
Recupertor, Quench basket, p/f & chimney etc.
Saraburi
Ceramic Plant
-
Fabrication & Installation: 70 Tons
-
Previous
Next